What We Say

Primary Re-Ignition Case Study

DLN-1 high load transfer; very specific solutions can eliminate upsets and control costs.

 

 

There are several potential causes for Primary Re-Ignition (PRI). The OEM typically blames the fuel quality, which requires considerable expense and time to fix. TTS however, takes a more open perspective, troubleshoots the problem and makes very specific recommendations that eliminate the upsets and control costs. This case study details a solution for PRI we call HLAT (High-Load Automatic Transfer).

Click here to read the case study

 

Share Our Articles:
LinkedIn
Facebook
Twitter
WhatsApp
We Innovate

Trusted Resource For Ontime Execution

TTS is the flagship for two market-focused companies: TTS Power and TTS Midstream. Our focus on economic, operational results ensures our client’s success.
100 + Partnering Countries

Our engineering experts are ready to assist you.

    We Innovate

    Innovative Solutions Across The Globe

    Over 40 years of experience managing hundreds of gas turbine installations, modernization projects, and high-value engineering solutions for a very wide range of complex projects.

    Related Posts...